Agenda item
Shropshire Local Cycling & Walking Infrastructure Plan
Report of the Strategic Projects Manager is attached
Contact Ffion Horton Ffion.Horton@shropshire.gov.uk
Minutes:
It was proposed by Councillor Ian Nellins, Deputy Leader and Portfolio Holder for Climate Change, Environment and Transport and seconded by Councillor Nick Bardsley that the report of the Executive Director of Place, a copy of which is attached to the signed minutes and the recommendations contained therein, be received and agreed.
By way of amendment Councillor Julian Dean proposed
Under recommendation 3.2 add at the end add
“with the addition to the Shrewsbury delivery plan of a Porthill/Copthorne 20mph zone, consultation on which was approved by Cabinet and has been completed; which meets the aims and objectives of the LCWIP; which has an evidence base showing meaningful contribution to those aims and objectives; which has been withdrawn from active pursuit without Cabinet approval.”
Councillor Nellins indicated that he would accepted the amendment.
By way of amendment Councillor Bernie Bentick proposed
“That LCWIP Report Appendix 7 on Page 27 be corrected to show LCWIP Secondary Route S48 referring to and including improvements for walking and cycling on Longden Road from and including the Roman Road/Longden Road roundabout, past The Meole Secondary and Priory Schools, past the Sweetlake Meadow development, though the outlying villages to the end of this route at Pulverbatch”
This was seconded by Councillor Rob Wilson. On taking a vote the amendment was not supported.
RESOLVED:
That Council:
1. Adopt the final Shropshire Local Cycling and Walking Infrastructure Plan attached to this Report as Appendix 1
2. Adopt each Local Cycling and Walking Infrastructure Plan (LCWIP) Delivery Plan for Shrewsbury, Oswestry, Market Drayton, Whitchurch, Ludlow, Bridgnorth and Church Stretton with the addition to the Shrewsbury delivery plan of a Porthill/Copthorne 20mph zone, consultation on which was approved by Cabinet and has been completed; which meets the aims and objectives of the LCWIP; which has an evidence base showing meaningful contribution to those aims and objectives; which has been withdrawn from active pursuit without Cabinet approval
3. Accept that an annual re-evaluation of the prioritisation of schemes will be undertaken by officers and reported back to Cabinet (appendix 10).
With the agreement of Members the Chair announced that he would take Item 18 – Annual report of the Portfolio Holder for Highways next
Supporting documents:
- Shropshire Local Cycling & Walking Infrastructure Plan Council report (1), item 26. PDF 549 KB
- Appendix 1 - Shropshire LCWIP v1.1, item 26. PDF 4 MB
- Appendix 2 - Bridgnorth v1.2, item 26. PDF 5 MB
- Appendix 3 - Church Stretton v1.2, item 26. PDF 5 MB
- Appendix 4 - Ludlow v1.2, item 26. PDF 5 MB
- Appendix 5 - Market Drayton v1.2, item 26. PDF 5 MB
- Appendix 6 - Oswestry v1.2, item 26. PDF 6 MB
- Appendix 7 - Shrewsbury v1.2, item 26. PDF 8 MB
- Appendix 8 - Whitchurch v1.2, item 26. PDF 5 MB
- Appendix 9 - Shropshire LCWIP Consultation Report_v1.0 (1), item 26. PDF 1 MB
- Appendix 10 - Shropshire Scheme Appraisal Technical Note_v1.2, item 26. PDF 5 MB