2024/25 bridge maintenance programme
Bridge name / description |
Bridge number |
URS no. |
OSGR or postcode |
Works description |
Planned date of work |
Betton Street Railway Footbridge |
B5091 |
F4085/ 10 |
SJ 499 118 |
Remove Redundant Structure over Shrewsbury to Hereford Line. Slip in programme to 2024/ 25 due to ongoing correspondence with NR regarding possession dates and delay damage costs. |
Postponed until 2025/26 |
Montague Street Railway Footbridge |
B5234 |
F4072/ 10 |
SJ 497 113 |
Maintenance of sub-standard bridge elements . Budget Construction Costs to be confirmed. Slip in programme to 2024/ 25 due to ongoing correspondence with NR regarding Possession Dates and delay damage costs. |
Postponed until 2025/26 |
Bind Footbridge |
B4904 |
U8148/ 20 |
SO 726 837 |
Replace surfacing and parapet walls/ railings washed away in floods during 2021/22. |
Completed 23 September 2024 |
RoW - Adcote Mill Footbridge |
B7048 |
U1716/ 10 |
SJ 422 195 |
Replacement of Rights of Way (RoW) footbridge which has partially collapsed. This is subject to conclusion of current Legal Proceedings. |
To be confirmed |
Rindleford Footbridge |
B4901 |
U7115/ 10 |
SO 737 955 |
Removal and Construction of collapsed footbridge |
Postponed until 2025/26 |
Broad Bridge |
B4330 |
B4176/ 45 |
SO 761 981 |
Masonry and pointing works to cutwaters and arches. |
Completed 27 September 2024 |
Meole Brace Bridge |
B5327 |
A5191/ 10 |
SJ 490 107 |
Concrete repairs to soffit |
Completed 7 October 2024 |
Meole Brace Footbridge |
B5328 |
A5191/ 10 |
SJ 490 107 |
Replace surfacing and repaint existing structure. |
Postponed until 2025/26 |
Upper Craignant |
B1784 |
U0109/ 10 |
SJ 254 350 |
Culvert Replacement |
Completed 9 October 2024 |
Pimley Manor River Severn Bridge |
B5136 |
A49/ 15 |
SJ 523 140 |
Undertake maintenance painting to existing structure. |
Completed 12 November 2024 |
Uffington River Severn Bridge |
B3132 |
A49/ 15 |
SJ 524 134 |
Undertake maintenance painting to existing structure. |
Completed 18 November 2024 |
Nant Lane Retaining Wall |
Division 1 |
U0119/ 15 |
SO 581 746 |
Special inspection 2022 identified a collapsed section of retaining wall circa 15 square metres. Retaining wall to be repaired/ rebuilt. |
Postponed until 2025/26 |
A490 Chirbury to Churchstoke Embankment Slip |
A490/40 |
A490/40 |
SY15 6DS |
Hard engineered piling solution required to fix 25m section of slipped embankment. Temporary/permanent traffic lights installed as temporary measure whilst solution is being completed. |
Postponed until 2025/26 |
A488 Hope Valley Embankment Slip. |
A488/361 |
A488/361 |
SJ350017 |
Earth retaining wall solution to slipped embankment. Temporary traffic lights installed as temporary measure whilst design solution is being completed. |
Planned for 2025/26 |
A4117 From Station Road End To Hereford And Worcester County Boundary Lem Hill, Cleobury Mortimer (Baveney Culvert) |
A4117 |
A4117 |
|
Reconstruction of collapsed headwall. Temporary traffic lights installed as temporary measure whilst design solution is being completed. |
Planned for 2025/26 |