Shropshire Council

2021/22 bridge maintenance programme

Bridge name description

Bridge no.

Works description 

Date of work

Bage Way Railway Bridge

B5234

Replace expansion joint and resurfacing.

Works completed.

Rectory Road

B3487

Bridge maintenance works

Works completed.

Whitcott Evan

B6412

Bridge maintenance works

Works completed.

Malehust No. 1

B5733

Bridge maintenance works

Works completed.

Grindley Brook Canal Bridge

B2121

 

Scheduled for 2022/23

Lawn No. 2

B6733

Concrete repairs to bridge

Works completed

Coleham Head

B5218

Bridge maintenance and strengthening works

Scheduled for 2022/23

Coed yr Hendre

B6715

Bridge maintenance works

Work completed

Ironbridge Road Slip (Road Ref - B4373)

n/a

Reinforced earth solution to fix carriageway/embankment slip together with improvements in surface water drainage.

Works to be re-programmed for completion in 2022 due to clash with statutory undertakers utility works and other roadworks on the Telford and Wrekin Highway Network.

Cound Arbour Bridge Highway Alignment

B5713

Temporary road alignment trial using small concrete blocks and chevron arrow signs and road reflectors.

Works yet to be designed and programmed but to be completed in FY 2021/22 if possible.

Back Lane Bridge Replacement

B3724

Bridge/culvert replacement scheme

Completed (road reopened Friday 5 November 2021)

Dana Footpath, Shrewsbury Town Centre

n/a

Scope of Works changed again in 2020.

Likely to be carried out in 2022/23

CG44 Hints Cattle Grid Replacement

CG44

Cattle grid replacement

Works completed.

CG49 Hill House Cattle Grid Replacement

CG49

Cattle grid replacement

Works completed.

RETW00230 Holybush Road Retaining Wall Major Repairs

RETW00230

Retaining wall repairs

Likely to be carried out in 2022/23.

Porthill Bridge Re-decking

B5962

Replace deck boards and anti-slip surface.

Likely to be carried out in 2022/23

Becks Field, Pengwern Boat House, Shrewsbury

n/a

Localised embankment slip adjacent to access road leading up to Boat House.

Works completed.

B4368 - Clun to Newcastle Road Embankment/ Road Slip

B4368/45

Gabion wall solution to embankment failure.

7 February 2022 for six weeks

Frodesley Lane Culvert next to Brook House

n/a

Voids to left and right abutments due to scour damage and right downstream damage to parapet handrails and posts.

Works scheduled for 2022/23

A488 Wagbeach Culvert

n/a

 

 

Downstream end of culvert has collapsed. Transverse crack at crown along full length.

Works scheduled into FY 2022/23

Mustard Pot Culvert

B1416

Divisional culvert - sunken road; road closed on 27/11/20

Works scheduled into FY 2022/23

Leaton Lodge Culvert

B1514

Downstream void and wash out.

Completed.

Rindleford Footbridge (Listed)

B4901

4-span timber footbridge over ROW network with failed sections to spans 1, 2 and 3. Listed status. Footpath closed on H&S grounds and looking to remove the redundant structures as interim position to assess the structure.

Works yet to be programmed but to be completed in 2021/22.

Lydham Heath bridge

B6400

Scoured abutments and downstream end of culvert has collapsed 1m section.

Works completed.

Winterburn Bridge (B4435)

B4435

Remedial works to embankment and verges.

Completed.

Llanyblodwel

B1640

Bridge strike (unknown driver) has caused damage to parapet, spandrel and cutwater. Bridge closed at present and diversion route in place.  

Works to be carried out in 2022/ 23 due to SAM Consent required, using lime mortar, sandstone procurement and ecological constraints.

A490 - Chirbury to Churchstoke Embankment Slip

A490/40

Move road or engineering piled solution to fix 30m embankment slip. Likely to be 2022 at earliest. Installing temporary permanent traffic lights (TPTL) in 2021/22.

TPTL to be programmed but to be completed in FY 2021/22.