Bridge name / description

Bridge number

Works description

Date of work

Grindley Brook Canal Bridge

B2121

Concrete repairs to superstructure

Scheduled for the 9 January 2023 for six weeks

Rindleford Footbridge

B4901

 Removal of collapsed footbridge

Scheduled for 31 October 2022 for three weeks

RETW00230 Holybush Road

RETW00230

Retaining wall major repairs

Works completed

Coleham Head

B5218

Bridge maintenance and strengthening works

Works completed

Porthill Bridge re-decking

B5962

Replace deck boards and anti-slip surface

Scheduled for 14 November 2022 for four weeks

Ironbridge Road slip (Road ref - B4373)

n/a

Reinforced earth solution to fix carriageway/embankment slip together with improvements in surface water drainage

Work has started on this site.

Wagbeach Culvert

B5962

Advance works / vegetation and tree clearance

Scheduled for 14 November 2022 for one week   

Quaking Brook Bridge

B6341

Parapet repairs following bridge strike

Works completed

Sweeney Bridge  

B6341

Parapet repairs following bridge strike

Works completed

Brooksmeeting No 1 Bridge

B4707

Take down and rebuild left parapet, spandrel and wing wall

Scheduled for 14 November for four weeks

Llanyblodwel No 1 Bridge

B1640

Bridge strike (unknown driver) has caused damage to parapet, spandrel and cutwater. Bridge closed at present and diversion route in place

Works completed

Monkhopton No 2 Bridge   

B4316

Repair to the collapsed section of the upstream end of the structure

Works completed

Cound Arbour Bridge highway alignment

B5713

Temporary road alignment trial using small concrete blocks and chevron arrow signs and road reflectors.

Scheduled for 2022/23

Abbey Foregate Bridge

B5232

Repair to damaged section of steel parapet

Scheduled for 2022/23

The Mount retaining wall

N/A

Repair to masonry retaining wall

Scheduled for 2022/23

Smithfield Road Cantilevers

B5221

Repair to masonry retaining wall

Scheduled for 2022/23