SITP funding
Funding for the proposed SITP has been secured and will comprise a total of £12.1m of investment in the town. This has been secured through the following sources:
- c.50% funded through The Marches LEP Regional Growth Fund
- c.50% funded through Shropshire Council’s developer contributions
Consultation, design and procurement is taking place in 2016. The outline construction programme is set out below:
Location | Timescale |
---|---|
Key Junctions : Meole Brace Roundabout Reabrook Roundabout Coleham Head English Bridge Gyratory |
2016/2017 2017 2017/2018 2017/2018 |
Pride Hill |
2017/2018 |
SCOOT |
2016/2018 |
Variable message signs |
2020 |
Town centre packages |
2018-19 |
Sustainable Corridors / Pedestrian and Cycle route Enhancement |
2019-20 |
Pedestrian Wayfinding |
2016-19 |